Laminate Bounces or Creaks
Likely cause: Boards spanning a dip in the screed.
What we do: Floor lifted, levelled and relaid.
Al Salam Tower, Office 15B, Al Barsha, DubaiEvery day, 8am to 10pm
Levelling from AED 30*/m²
If a marble rolls across your floor or new laminate creaks and bounces, the base is uneven. We measure floors with a laser and straightedge, grind high spots and pour self-levelling compound into dips, giving a flat surface for laminate, vinyl, carpet or tiles.
Diagnose
Likely cause: Boards spanning a dip in the screed.
What we do: Floor lifted, levelled and relaid.
Likely cause: Boards flexing over high spots.
What we do: High spots ground, low spots filled.
Likely cause: Floor rises towards one side.
What we do: Floor levelled or door trimmed.
Likely cause: Floor dips along a wall.
What we do: Feathered compound fills the dip.
Flat Floors
Dips and ridges ruin new flooring.
We measure, grind, prime and pour a flat base.
Process
A laser and 2 m straightedge map the highs and lows.
High spots and old adhesive are ground and vacuumed.
A levelling primer seals the base and stops air bubbles.
Self-levelling compound is poured and spread to a flat finish.
Most click laminate and SPC vinyl need a floor flat to within about 3 mm over 2 metres. Glue-down vinyl needs even better, because every bump shows through.
Self-levelling compound is walkable in a few hours, but the drying time before flooring depends on depth. Thin pours can be covered the next day.
For screeds before any finish, see subfloor levelling. For damaged patches, see floor patching, and for timber, parquet installation.
Pricing Guide
Priced per square metre by depth.
*Prices shown are starting guides only. They vary and can change depending on your requirements, the size of the job, the surface, the materials and access to your building. You agree the final price before any work begins.
Up to 5 mm.
From AED 30*/m²
5 to 10 mm.
From AED 45*/m²
Where needed.
From AED 15*/m²
Local repairs.
Quoted per area
Tools and Materials
Flows flat by itself. Fast setting. Smooth.
Seals and bonds the base. No pinholes. Strong.
Removes high spots and adhesive. Clean base. Precise.
Maps highs and lows. Accurate. Fast.
Based in Al Barsha since 2014, we work across every Dubai community with trade-specialist technicians and a workmanship guarantee on every job.
Laser survey, not guesswork. Accurate. Right depth.
No bubbles or debonding. Strong. Lasting.
Walkable in hours. Less disruption. Convenient.
We fit the new floor after. One team. Simple.
Most click flooring needs no more than about 3 mm of variation over 2 metres. More than that and boards flex, click joints break and floors sound hollow, so we level first.
Yes, if the surface is flat, sound and dry. Floating laminate and SPC vinyl go straight over tiles with an underlay. Uneven tiles or concrete are levelled first.
A typical apartment bedroom is fitted in a day. A full two-bedroom apartment usually takes two to three days, plus drying time if the floor needs levelling first.
Laminate and SPC vinyl installation starts from AED 25 per square metre for labour, and from about AED 70 per square metre supplied and fitted. Levelling and skirting are quoted separately when needed. Prices vary and can change depending on your exact requirements, the materials and access to the property, so the final price is confirmed after we see photos or visit.
Areas We Cover
We level uneven floors across Dubai.
Send photos and we will survey and quote.