Mosaic Tiles Falling Off
Likely cause: Adhesive failure.
What we do: Area cleaned back and reset.
Al Salam Tower, Office 15B, Al Barsha, DubaiEvery day, 8am to 10pm
Repairs from AED 500*
Pool tiles take constant water, chlorine and heat. Waterline tiles crack, mosaics fall off and copings work loose. We repair and replace pool tiles, waterline bands and copings in drained or partly drained villa pools, using pool-grade adhesives and grout, and coordinate with your pool company.
Diagnose
Likely cause: Adhesive failure.
What we do: Area cleaned back and reset.
Likely cause: Heat and movement.
What we do: Tiles replaced with flexible adhesive.
Likely cause: Bedding broken down.
What we do: Lifted and rebedded.
Likely cause: Chlorine and water wear.
What we do: Regrouted with epoxy.
Pool Ready
Pool tiles need pool-grade materials.
We repair waterlines, mosaics and copings in drained pools.
Process
Your pool company lowers or drains the pool to the repair level.
Loose and cracked tiles are removed and the base cleaned.
Tiles are set with pool-grade adhesive.
Epoxy grout is applied and cured before refilling.
Ordinary adhesives and grout break down under water and chlorine. Pool repairs use submersion-rated adhesives and epoxy grout.
We work on drained or lowered villa pools. Pool structure, pumps and leak detection stay with your pool specialist.
For mosaics, see mosaic tile installation. For surrounds, see outdoor tiling, and for repairs, indoor and outdoor tile repair.
Pricing Guide
Priced per repair area.
*Prices shown are starting guides only. They vary and can change depending on your requirements, the size of the job, the surface, the materials and access to your building. You agree the final price before any work begins.
Small area.
From AED 500*
By tile type.
Quoted per metre
Per stone.
From AED 120*
Pool grade.
Quoted per area
Tools and Materials
Holds under water. Lasting. Pool safe.
Chlorine resistant. Waterproof. Durable.
Matched to your pool. Neat. Blended.
Rebeds copings securely. Strong. Safe.
Based in Al Barsha since 2014, we work across every Dubai community with trade-specialist technicians and a workmanship guarantee on every job.
Right materials for water. Lasting. Reliable.
Works with your pool company. Smooth. Simple.
No early refill. Repair lasts. Patient.
Structure and pumps for specialists. Clear. Fair.
Yes. Showers, bathrooms and balconies get a tanking membrane, sealed corners and pipe collars before tiling, plus correct falls to the drain.
Labour for floor tiling starts from AED 45 per square metre and wall tiling from AED 55 per square metre for standard porcelain and ceramic. Large format, mosaic and natural stone cost more because they take longer to set. Prices vary and can change depending on your exact requirements, the materials and access to the property, so the final price is confirmed after we see photos or visit.
A bathroom usually takes three to five days including waterproofing and curing. A kitchen splashback is often done in a day. Floors depend on the area and tile size.
We measure and survey the surface, agree tiles and layout, prepare and waterproof where needed, set tiles on the right adhesive, grout and seal, then clean up. Most rooms take two to four days including curing time.
Areas We Cover
We repair pool tiles in villas across Dubai.
Send photos and the pool size.