Hollow-Sounding Tiles
Likely cause: Adhesive not fully bedded.
What we do: Back-buttering and full trowel coverage.
Al Salam Tower, Office 15B, Al Barsha, DubaiEvery day, 8am to 10pm
Floors from AED 45*/m²
Floor tiles need to be flat, fully bedded and given room to move. Hollow spots crack, lips catch toes and floors without movement joints tent up in summer. We lay porcelain, ceramic and stone floor tiles level on prepared screeds, with full adhesive coverage and movement joints.
Avoid
Likely cause: Adhesive not fully bedded.
What we do: Back-buttering and full trowel coverage.
Likely cause: No movement joints.
What we do: Perimeter and field joints set.
Likely cause: Uneven screed or setting.
What we do: Levelled base and clip system.
Likely cause: Voids or moving base.
What we do: Sound, flat base and full bed.
Solid Floors
Floor tiles must be flat, bedded and free to move.
We prepare, lay, clip and joint every floor.
Process
Screed level, moisture and strength are checked.
Centre lines are marked so cuts are even at walls.
Tiles are fully bedded and levelled with clips.
Floors are grouted and movement joints sealed.
Floors expand in heat, especially near glass doors and on ground floors. Perimeter gaps and flexible joints in large floors stop tiles from tenting.
Large format tiles are popular, but they need a very flat base. We level the screed first where needed.
For walls, see wall tile installation. For levelling, see floor levelling, and for repairs, cracked tile replacement.
Pricing Guide
Labour per square metre.
*Prices shown are starting guides only. They vary and can change depending on your requirements, the size of the job, the surface, the materials and access to your building. You agree the final price before any work begins.
Up to 60 cm.
From AED 45*/m²
60 x 120 cm and up.
From AED 70*/m²
If needed.
From AED 30*/m²
Per metre.
From AED 20*/m
Tools and Materials
Flat joints, no lips. Precise. Safe underfoot.
Full adhesive coverage. No voids. Solid.
Handles movement and heat. Strong. Lasting.
Allow expansion. No tenting. Smart.
Based in Al Barsha since 2014, we work across every Dubai community with trade-specialist technicians and a workmanship guarantee on every job.
Full bed coverage. Solid. Lasting.
Clips and levelled base. No lips. Premium.
Movement allowed. No tenting. Durable.
Even cuts at walls. Balanced. Neat.
Labour for floor tiling starts from AED 45 per square metre and wall tiling from AED 55 per square metre for standard porcelain and ceramic. Large format, mosaic and natural stone cost more because they take longer to set. Prices vary and can change depending on your exact requirements, the materials and access to the property, so the final price is confirmed after we see photos or visit.
Often, yes, if the old tiles are flat, firmly bonded and not hollow. We test them, prime with a bonding primer and use a suitable adhesive. Door heights and floor levels are checked first.
A bathroom usually takes three to five days including waterproofing and curing. A kitchen splashback is often done in a day. Floors depend on the area and tile size.
Small splashbacks can be a DIY project. Floors, wet areas and large format tiles need flat preparation, waterproofing and precise setting, and mistakes are costly to undo.
Areas We Cover
We tile floors across Dubai.
Send room sizes and tile size for a quote.